top of page
55937421_2181788488554538_5383643206619496448_n.jpg

HI I’M MUHAMMAD MUEEZ NAZAKAT

Personal Profile

As a skilled and experienced professional in my field, I know how much hard work and careful thought it takes to succeed. My CV site is my way of documenting everything I’ve done, everything I’ve learned and how I see myself developing in the future. If you’d like to learn more about me, browse through the site. If you see something you like, or you want to discuss what I can do for you, feel free to drop me a line.

Learn More
Home: Welcome
122_edited.jpg

GET TO KNOW ME

There are so many people in the world who never have the opportunity to pursue the career they love. I’m not one of them. I love what I do and since starting my career in Sialkot, Pakistan, I’m thrilled to say that I’ve learned from so many trained professionals in my field. I know that I still have so much to learn from others in the industry. I’m a hard worker, a team player and excited to see what projects could benefit from my unique skill set.

Home: Bio

PROFESSIONAL HISTORY

My Qualifications

ASSISTANT PRODUCTION MANAGER, (VIVO COMMUNICATIONS CO. LTD)

January 2021 - Current

1) Arrange production tasks reasonably according to the production plan, make full use of resources, complete the production plan on time, and be responsible for the quality of the production process and product quality
2) Check and approve labor costs, materials and equipment against process documents to control unnecessary expenses
3) Adopt the PDCA method to continuously improve the existing process methods and improve the management level
4) Identification of bottlenecks in production efficiency and achieving the efficiency improvement of at least 2% gain each month

MANUFACTURING EXCELLENCE OFFICER, (AWAN SPORTS INDUSTRIES PVT. LTD)

July 2019 - January 2021

1) Launched Efficiency based incentive system that replaced the conventional piece-rate system that helped to achieve 70% efficiency.
2) Launched kaizen culture throughout the organization that involves middle to higher management which results in 100+ kaizens in season and an accumulated saving of up to 50 million pkr.
3) Automation from manual table printing to machine printing in soccer ball division that helps us to mitigate the cost up to 3 million pkr
4) Launched ME framework and ME training culture to equip the young industrial engineers with necessary training which include FMEA, Kaizen, PDCA, VSM, Line balancing, Deployment charts, Spaghetti map, OEE, etc.

INTERNEE ENGINEER (MILLAT TRACTORS LIMITED)

August 2018 - September 2018

1) Project lead working on 8 wastes reduction improving the productivity by reducing the inventory waste

2) Implemented the 6S (Sort Out, Set in Order, Shine, Standardise, sustain, Safety) in Tractor assembly workshop resulting in the improved efficiency

INTERNEE ENGINEER (PAK ELECTRON LIMITED)

June 2018 - July 2018

1) Proposed assembly line balancing in Refrigerator assembly workshop with proposed output in assembly from 900 units to 1100 units per day
2) Performed complete Time study of water dispensing unit assembly line fir balancing and proposed the elimination of extra operators for improved the efficiency

Home: Experience
Screenshot_20220405-214041_Instagram.jpg

EDUCATION

My Schooling

INDUSTRIAL & MANUFACTURING ENGINEERING (UNIVERSITY OF ENGINEERING & TECHNOLOGY LAHORE)

October 2015 - August 2019

INTERMEDIATE (PUNJAB GROUP OF COLLEGES)

September 2013 - July 2015

MATRIC (GOVT. M.C HIGH SCHOOL, OKARA)

April 2011 - July 2013

Home: Education

PROJECTS

Take a Look

Production Loss Reduction

1) Optimisation of production processes according to lean manufacturing tools to reduce the production materials loss
2) Achievement of loss reduction target up to 170% by ensuring complete control of potential causes for loss

Study and Implementation of Overall Operator Effectiveness (OOE) in a sports goods manufacturing firm

The project includes the deep time study of assembly line stitching operators and their skill analysis in order to balance the assembly Lines and hence rating the operators based on their skills in different categories to implement a continuous improvement cycle as well as to develop a competitive culture driven towards efficiency optimisation goals.

Composite Closing of Soccer Balls

1) Use of composite material to close the soccer ball panels instead of stitching, based on lean manufacturing concept to minimize the cost and maximize the productivity
2) The project resulted in the reduction of 7 operators out of 20 leading towards improved manufacturing cost and efficiency

Home: Projects

SKILLS

Knowledge & Expertise

Home: Skills

Microsoft Office

Advanced

88d63991-11e7-41c0-b526-e78db2bca7ee.jpg

Abraham Lincoln

"Whatever you are, be a good one"

Home: Quote

HONORS AND AWARDS

Header Subtitle

CERTIFIED TRAINER FOR LEAN MANUFACTURING TOOLS (2022)

Coastal Jade Technology Pvt. Ltd (Vivo Pakistan)

WINNER OF KAIZEN COMPETITION 2020

Awan Sports Industries Pvt. Ltd.

RECOGNITION OF VICE CHANCELLOR U.E.T LAHORE FOR BEING HEAD CAMPUS AMBASSADORS AT UET NEWS

University of Engineering and Technology Lahore

USAID MERIT BASED SCHOLARSHIP (2015-2019)

University of Engineering and Technology, Lahore

WINNER OF BEST MEMBER OF GENERAL BODY ASHRAE U.E.T LAHORE (2017)

University of Engineering and Technology, Lahore

MERIT BASED 100% TUTION FEE WAIVER IN PUNJAB COLLEGE (2013-2015)

Punjab College of Science, Okara

Home: List

CONTACT

Thanks for submitting!

Home: Contact

©2022 by Muhammad Mueez Nazak. Proudly created with Wix.com

  • LinkedIn
  • Facebook
bottom of page